RUDDER THEATER GETS UPDATED LOOK


Rudder Theater After Renovations

As many have already noticed, Rudder Theater has a fresh look! The two phase renovation project took place over winter break 2017 and 2018. The theater is used so much it was hard to find time when it would be closed to be able to complete the renovation. The scope included a cosmetic renovation of the 750 seat theater including painting the ceiling, replacing flooring, and replacing seating. This project was overseen by Engineering, Design, and Construction Services Project Manager Sarah Morris. Great job, Sarah!

Rudder Theater Before Renovations

Follow Us
  • Twitter Basic Black
  • Facebook Basic Black
  • Black Google+ Icon
Recent Posts
ASA_Logo 2019.png
Does your office have a 
Sustainable Office Certification?
Click the logo to learn more ...